The Project

Geothermal Well Drilling

Running the Ground Loop Tubing

Putting the tubing in the ground isn't that big a deal. They pretty much run it into the well in about 10 minutes.

Geothermal Ground Loop Tubing

The factory makes the special bend and tests it to make sure it is strong.

Ground Loop Tubing End

Ground Loop

<- Catching the Mud and Rock | End of Day One ->